DBO: WWPS Egailah

  • Egailah WWPS was commissioned in the year 2011 and delivers wastewater with a current hydraulic capacity of up to 2.8 m3/s to the existing Riqqa WWTP.
  • The hydraulic capacity of Egailah WWPS shall be increased from 2.8 m3/s to 8.3 m3/s.
  • All upgrade measures shall be implemented without any interruption of the operation of the Egailah WWPS.
  • New substation (132/11 kV) to deliver sufficient power for the upgraded Egailah WWPS.
Details regarding the connecting sewer pipes:
  • DN 2250: Invert level approx. -39.3m bgl; delivers up to 6.8 m3/s