Preliminary Treatment 
- Inlet
- Screening
- Grit Chamber
Loading
Nullam dignissim, ante scelerisque the is euismod fermentum odio sem semper the is erat, a feugiat leo urna eget eros. Duis Aenean a imperdiet risus.
Parameter | Unit | Stage 1 | Stage 2 |
---|---|---|---|
Average Daily Flow | m3/d | 500,000 | 700,000 |
Maximum Daily Flow | m3/d | 550,000 | 770,000 |
Average Hourly flow | m3/h | 20,833 | 29,167 |
Peak Hourly Flow | m3/h | 30,417 | 42,583 |