Projects

Home Projects

College of Applied Education

Client Name PAAET
Total Power Capacity (kWp) 2,007
Location Al Ardia
Execution Date 2016
Scope of Work Project Management

Security and Emergency Building

Client Name Kuwait University
Total Power Capacity (kWp) 10
Location Kifan
Execution Date 2016
Scope of Work Engineering Design, Procurement, Installation, Operation, Maintenance

Recreation Center On-Grid System

Client Name US Army Camp
Total Power Capacity (kWp) 102
Location Al Abdaly
Execution Date 2017
Scope of Work Engineering Design, Installation Supervision, Commissioning

Recreation Center On-Grid System

Client Name US Army Camp
Total Power Capacity (kWp) 102
Location Al Abdaly
Execution Date 2017
Scope of Work Engineering Design, Installation Supervision, Commissioning

Caterpillar Off-Grid System

Client Name Al Bahr Co.
Total Power Capacity (kWp) 2.64
Location Shuwaikh
Execution Date 2017
Scope of Work Engineering Design, Procurement, Installation, Operation, Maintenance

Fatima Al Awadi Mosque

Client Name Ministry of Al Awqaf
Total Power Capacity (kWp) 10.6
Location Khaitan
Execution Date 2018
Scope of Work Engineering Design, Procurement, Installation, Operation, Maintenance

VW Show Room

Client Name Behbehany Motors Group
Total Power Capacity (kWp) 139.5
Location Al Rai
Execution Date 2018
Scope of Work Engineering Design, Procurement, Installation, Operation, Maintenance

Central Body Shop

Client Name Behbehany Motors Group
Total Power Capacity (kWp) 831.6
Location Shuwaikh
Execution Date 2018
Scope of Work Engineering Design, Procurement, Installation, Operation, Maintenance

Unit 260 Ardiya Stores

Client Name Al Sayer Group
Total Power Capacity (kWp) 1000.4
Location Ardiya
Execution Date 2020
Scope of Work Engineering Design, Procurement, Installation, Operation, Maintenance

Solar Power for 6 Stores at Subhan Area.

Client Name Ministry of Elect. & Water and Renewable Energy
Total Power Capacity (kWp) 3,758.4
Location Subhan
Execution Date 2021
Scope of Work Testing and Commissioning 6 Centralized Inverters

100 Bus Stop Units Off-Grid System

Client Name KPTC
Total Power Capacity (kWp) 106
Location Several locations
Execution Date Pending
Scope of Work Engineering Design, Procurement, Installation, Operation, Maintenance

PV Diesel Hybrid Solar System for South Kuwait Excavation, Transportation, and Remediation (SKETR – 3) project

Client Name Enshaat Al Sayer Gn. Tr. & Con. Co.
Total Power Capacity (kWp) 263.78
Location Burgan Oil Field
Execution Date Dec/23/2022
Scope of Work Engineering Design, Procurement, Installation, Operation, Maintenance

Toyota / Lexus Showroom in Abu Fatira - Aswaq Al Qurai

Client Name Al Sayer Group
Total Power Capacity (kWp) 100
Location Abu Fatira
Execution Date Aug/30/2023
Scope of Work Troubleshooting and Refurbishing existing PV Solar System

Training Center for Suitability of Operating the Electrical Networks Distrib مركز تدريب قطاع شبكات التوزيع الكهربائية

Client Name Ministry of Elect. & Water and Renewable Energy
Total Power Capacity (kWp) 10.3
Location Al Salam
Execution Date Sep/15/2023
Scope of Work Engineering Design, Procurement, Installation, Operation, Maintenance